PROJECT AUTHORIZATION PACKET ID: PMT-UP68
CONTRACT ID EMARS PROGRAM CODE AUTHORIZATION NO:
1365901P      13659 0
It is hereby ordered that the project herein described be undertaken and accomplished within the funding level authorized.
PROJECT ID PROJECT ID NUMBER FEDERAL PROJECT NUMBER 6 YR PLAN ITEM NUMBER 6 YR PLAN ITEM PARENT NUMBER
008 007 5 171-172
008 002 5 000-005
NHPP 0757151

06-00080 6-.-
PROJECT TYPE PROJECT LENGTH NUMBER OF BRIDGES SYSTEMS
0.8000 MI
PROJECT PHASE
&
RESPONSIBILITY
PLANNING DESIGN RIGHT OF WAY UTILITIES
CONSTRUCTION TITLE DEEDED TO: MAINTENANCE OTHER
FUNDING & TIME
ACCOUNTABILITY
PARTICIPATING AGENCIES
FEDERAL FHWA STATE DOH LOCAL OTHER
REQUESTED FUNDS FOR THIS AUTHORIZATION
ITEM NUMBER PHASE FUND PROGRAM FEDERAL FISCAL YEAR STATE FISCAL YEAR
FEDERAL APPR
CODE
CURRENT FUNDING REQUEST
6-80 P 1100 FD04 2022 $650,000.00
CURRENT FUNDING REQUEST TOTAL: $650,000.00
AUTHORIZATION SUMMARY FOR THIS 10-1 SERIES
PHASE TOTAL AUTHORIZATION TO DATE (INCL. CURRENT REQUEST)
PLANNING $650,000.00
DESIGN $0.00
UTILITIES $0.00
R/W $0.00
CONSTRUCTION $0.00
NON-HIGHWAYS $0.00
  Total: $650,000.00
REMARKS: THIS AUTHORIZATION PROVIDES STATE (FD04) FUNDS TO BEGIN PLANNING STUDY FOR THE PROJECT. (FD04 FUNDING TO BE USED FOR FUTURE FEDERAL MATCH ON OTHER PHASES) (INCLUDES ITEM NO. 6-105)
 
Project Approval Recommended By:
James Ballinger   7/18/2021
Signed and Approved by:
Jim Gray   7/26/2021
AUTHORIZATION LOCATION
ITEM NO. COUNTY DIST FACILITY NAME
ROUTE LENGTH SCOPE
06-00080.00 BOONE
BOONE

6 I-75 I 75 0.8000 MI REDUCE CONGESTION AND IMPROVE TRAFFIC MOBILITY AT THE INTERCHANGE OF I-75 AND KY-14 IN WALTON. (2020CCR),CONDUCT PLANNING STUDY TO EVALUATE OPTIONS FOR RECONSTRUCTING US 25 BETWEEN KY 14 (MARY GRUBBS HIGHWAY) AND KY 338 (RICHWOOD ROAD).